Drone view of a road corridor cut straight through timber
Forestry & Land Clearing

Right-of-Way Clearing in BC

We clear rights-of-way for power and utility lines, pipelines, roads and municipal servicing, working as a sub to primes or direct for utilities and municipalities. We clear to the width and standard in your spec and leave the corridor ready for the next crew. Based in 100 Mile House, working across BC and into Alberta.

Corridors

The corridors we clear

Power and utility lines

Clearing for new line builds and widened corridors.

Pipelines

Pipeline right-of-way cleared to the staked width, with the timber decked where the plan says and the ground left ready for the next phase.

Roads

Right-of-way for new resource and access roads, cleared and grubbed ahead of the build. We can build the road too. See access and resource roads.

Municipal corridors

Water, sewer and servicing corridors, trails, and fuel breaks along community edges. For fuel treatment work, see FireSmart and fuel reduction.

On the job

Corridor cleared through timber with the slash windrowed to one side
Cleared corridor graded out under a power line
Track loader grading a road corridor through timber
Cleared and graded line along a new fence with an excavator at the far end
Decked logs beside a cleared corridor
John Deere 335P track loader with forestry guarding and grapple, moving decked timber on a forest road
How We Clear

We clear to your spec

We clear to the staked lines and the standard in your contract: the width, what comes out, what stays, and whether stumps are grubbed or cut flush. For site and development clearing, see land clearing.

Trees come down with the machines. The John Deere 250P we run handles the stumping, rock and decking on a corridor, and the road building where one goes in. Merchantable timber gets decked where the contract says, for the owner or for pickup. Slash is piled and burned when the rules allow, or loaded out and hauled. Danger trees along the edge come down before crews work under them, and where WorkSafeBC requires an assessment, a certified danger tree assessor does it.

Where the ground is too soft to carry equipment, access matting goes down so the work keeps moving and the ground is protected.

Drone view of a new access cleared off a main road
Season

Winter clearing

Frozen ground carries machines across wet meadows, soft ground and low ground that would rut up the rest of the year. A lot of corridor work goes best between freeze-up and breakup.

Winter work also stays clear of the spring and summer nesting window, slash piles burn well in winter conditions, and a corridor cleared in winter is ready for construction at breakup. If you want a corridor cleared this winter, fall is when to call.

Paperwork

Set up for prime and owner programs

  • WorkSafeBC registered and in good standing
  • $5M aggregate commercial general liability through Northbridge
  • Written safety management system with daily FLHAs, pre-use inspections and site emergency response plans (BCFSC SAFE Companies certification in progress)
  • Ground Disturbance Level II
  • Every crew member holds S-100 and S-185
  • We register with ISN, Avetta or ComplyWorks as required

We work under your safety program or ours. See working with prime contractors and safety, certifications and insurance.

FAQ

Right-of-way clearing — straight answers

Do you work as a subcontractor to primes?

Yes. We take right-of-way clearing as a sub to prime contractors or direct for the owner, utility or municipality, and we work under your safety program or ours.

How wide do you clear?

To the width in your spec and the staked lines on the ground. What comes out, what stays, and whether stumps are grubbed or cut flush all get set in the contract before we start.

What happens to merchantable timber?

It gets decked where the contract says, for the owner or for pickup. Slash is piled and burned when the rules allow, or loaded out and hauled.

Can you clear right-of-way in winter?

Yes, and a lot of it goes best in winter. Frozen ground carries machines over wet, soft spots that would rut up the rest of the year, the work stays clear of the nesting window, and the corridor is ready at breakup.

How far will you travel for right-of-way work?

We're based in 100 Mile House and take right-of-way work anywhere in BC and Alberta, including Vancouver Island and the coast.

Do you handle danger trees along the corridor?

Yes. Danger trees along the edge come down before crews work under them. Where WorkSafeBC requires an assessment, a certified Wildlife/Danger Tree Assessor does it and the work follows the assessor's recommendations.

Talk to us about your corridor

  1. 1.Tell us about the ground — five minutes.
  2. 2.We walk it with you and talk through what's urgent, what can wait, and rough numbers.
  3. 3.You get a written estimate with a defined scope. If we're not the right fit, we'll say so and point you at who is.

Call or text 250-329-7356 to speak directly with the owner. Or send the project through the form and we'll respond within one business day.

WorkSafeBC registered · $5M CGL · Written SMS · S-100/S-185 crews

Call Text